Home › Network & routing › pgRoutingLayer
pgRoutingLayer QGIS 4 compatibility
Not QGIS 4 ready Active
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
Dockable widget that adds pgRouting layers
About
Dockable widget that adds pgRouting layers - pgr_astar pgr_astarCost - pgr_bdAstar pgr_astarCost - pgr_dijstra pgr_dijstraCost - pgr_bdDijstra pgr_bdDijstraCost - pgr_KSP
| Author | Anita Graser, Ko Nagase, Vicky Vergara, Cayetano Benavent, Aasheesh Tiwari |
|---|---|
| Downloads | 61,666 |
| Latest version | 4.0.0 |
| Last updated | 2025-10-30 (351 days ago) |
| Min QGIS | 3.10.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Active |
| Category | Network & routing |
| Tags | network analysis, postgis, routing, pgrouting |
Homepage · Repository · Issue tracker · Official page
Alternatives in Network & routing
- ORS ToolsQGIS 4 ready
openrouteservice routing, isochrones and matrix calculations for QGIS
- NetworksQGIS 4 ready
Designed as a processing algorithm provider. Manage linear networks and compute multimodal routing and accessibility. Several functionalitie
- TravelTime PluginQGIS 4 ready
Get travel time polygons from the TravelTime API directly from QGIS
Related plugins
- GPF - Isochrone Isodistance ItinéraireQGIS 4 ready
Intégration de l'API de la Géoplateforme de calcul d'isochrone, d'isodisance et d'itinéraires dans QGIS.
- Area Along VectorNot QGIS 4 ready
Create an area along a vector depending on a field value. Right and left sides can be distinguished.
- Disconnected IslandsQGIS 4 ready
Finds disconnected "islands" in a transport network layer, so that a routing tool will work between all nodes. A tolerance field allows for
- Chinese Postman SolverNot QGIS 4 ready
Chinese Postman Solver
- Short PathNot QGIS 4 ready
Find shortest path between points based on line (network) layer.
- Transit Reachability AnalyserNot QGIS 4 ready
Using OpenTripPlanner to calculate public transport reachability from a starting point to all stops in a GTFS feed.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.