Home › LiDAR & point cloud › qpals
qpals QGIS 4 compatibility
Not QGIS 4 ready Quiet
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
OPALS software integrated into QGIS
About
IMPORTANT: This plugin requires an installation of OPALS developed by GEO at TU Wien. You can get an evaluation copy (processing up to 1.000.000 points) at opals.geo.tuwien.ac.at When the plugin is first loaded, you will be prompted to set a path to your opals installation. The point cloud processing software OPALS developed by GEO/TU Wien can be easily accessed from within QGIS through a custom-made gui. Also, special modules are available for specific tasks, i.e. creating sections.
| Author | Lukas Winiwarter |
|---|---|
| Downloads | 13,038 |
| Latest version | 1.9.0 |
| Last updated | 2025-01-29 (625 days ago) |
| Min QGIS | 2.99.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Quiet |
| Category | LiDAR & point cloud |
| Tags | point cloud, lidar, opals, als, laser scanning |
Homepage · Repository · Issue tracker · Official page
Alternatives in LiDAR & point cloud
- LAStoolsQGIS 4 ready
batch-scriptable, multicore command-line tools for processing point clouds in LAS, LAZ, and ASCII formats
- Pobieracz danych GUGiKQGIS 4 ready
Pozwala na pobranie danych z zasobów GUGiK z interfejsu QGIS. EN: Allows user to download spatial data of Poland based on GUGiK's services.(
- FUSION for ProcessingQGIS 4 ready
Suite of tools for LiDAR analysis and visualisation
Related plugins
- Open LiDAR ToolboxNot QGIS 4 ready
Open Tools for LiDAR Data Preparation and Analysis in Archaeology
- TrailScanQGIS 4 ready
Deep learning-based segmentation of skid trails from airborne LiDAR data
- qLidarNot QGIS 4 ready
QGIS plugin to use point clouds from LIDAR or Photogrammetry
- PDALtoolsNot QGIS 4 ready
Installs PDALtools Processing provider
- PointCloudFRQGIS 4 ready
Downloads LiDAR tiles from IGN that intersect with the input AOI
- LiDARHeightExtractorQGIS 4 ready
Plugin to compute nDSM from point clouds and compute maximal height per polygon (buildings, trees...). Qt6 ready.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.