Home › Georeferencing & CAD › PostGIS Topology Editor
PostGIS Topology Editor QGIS 4 compatibility
QGIS 4 ready Active
Yes — PostGIS Topology Editor supports QGIS 4 (declared max version 4.99.0).
Editing toolbar for PostGIS topology primitives (ISO SQL/MM based)
About
Editing toolbar for PostGIS topology primitives (ISO SQL/MM based)
| Author | Sandro Santilli |
|---|---|
| Downloads | 28,292 |
| Latest version | 0.4.1 (experimental) |
| Last updated | 2026-01-14 (275 days ago) |
| Min QGIS | 3.0.0 |
| Max QGIS | 4.99.0 |
| QGIS 4 ready | Yes |
| Maintenance | Active |
| Categories | Georeferencing & CAD, Database |
| Tags | postgis, topology |
Homepage · Repository · Issue tracker · Official page
Alternatives in Georeferencing & CAD
- Shape ToolsQGIS 4 ready
Shape Tools is a collection of geodesic shapes and tools. Create circle, ellipse, line of bearing, points along a line of bearing, concentri
- AnotherDXFImporterQGIS 4 ready
Add DXF to QGIS , optional georeferencing, optional convert DXF to Shape/GeoPackage
- LF ToolsQGIS 4 ready
Comprehensive solutions for cartographic production, surveying, drone mapping, GNSS data import, geospatial database management, digital ima
Related plugins
- Network StudioNot QGIS 4 ready
Utility network management for QGIS: water, sewer, storm, gas, electricity, fiber, telecom, district cooling and roads, in GeoPackage, Spati
- EDEA_EraseToolsNot QGIS 4 ready
Removes the part of a vector layer (points, lines or polygons) located inside a clip layer, with asynchronous processing, batch mode, and mu
- pgChainageNot QGIS 4 ready
plugin for chainage linestrings of a table directly in PostgreSQL/PostGIS
- CatastroV3Not QGIS 4 ready
Busqueda Catastral
- RubberSheetingEtcNot QGIS 4 ready
Provides Rubber Sheeting and Two Point Transformations, storing to PostGIS, Oracle and MS SQL. The Rubber Sheeting algorithm uses supplied S
- ISToolsNot QGIS 4 ready
Ferramentas integradas para edição vetorial, topologia, PostGIS e fluxos EDGV no QGIS.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.
