Home › Field data & mobile › Wincan Vx to TEKSI Importer
Wincan Vx to TEKSI Importer QGIS 4 compatibility
QGIS 4 ready Active
Yes — Wincan Vx to TEKSI Importer supports QGIS 4 (declared max version 4.99.0).
Wincan Vx to TEKSI Importer allows importing Wincan Vx data into TEKSI wastewater module.
About
Wincan Vx to TEKSI Importer allows importing pipe inspection TV data in Wincan Vx format into TEKSI Wastewater module. Wincan is a software for the inspection and management of the waste water infrastructure (http://www.wincan.com/). The data respects the EN 13508 norm. You can browse inspection data and review each observation and choose what will be imported. Data will be imported into a TWW project which has a data model respecting the Swiss-norm VSA-DSS.
| Author | OPENGIS.ch |
|---|---|
| Downloads | 864 |
| Latest version | 0.8 |
| Last updated | 2026-05-22 (147 days ago) |
| Min QGIS | 3.40.0 |
| Max QGIS | 4.99.0 |
| QGIS 4 ready | Yes |
| Maintenance | Active |
| Category | Field data & mobile |
| Tags | wincan, inspection, wastewater, qgep, teksi, tww |
Homepage · Repository · Issue tracker · Official page
Alternatives in Field data & mobile
- QField SyncQGIS 4 ready
Sync your projects to QField
- ImportPhotosQGIS 4 ready
Import Photos
- Mergin MapsQGIS 4 ready
Handle Mergin Maps projects
Related plugins
- Wincan 2 QGEPNot QGIS 4 ready
Wincan 2 QGEP allows importing Wincan data into QGEP.
- QITVNot QGIS 4 ready
Plugin Qgis pour les inspection telévisée de réseaux d'assainissements - QGIS plugin for sewer CCTV inspections
- TEKSI Module Management Tool (TMMT)QGIS 4 ready
This is the management tool for every TEKSI Module installation and upgrade
- Video Uav TrackerNot QGIS 4 ready
Replay a video in sync with a gps track displayed on the map (3d OPTIONS with 'panda3d' module installed)
- ThRasEQGIS 4 ready
Open-source QGIS plugin for rigorous thematic raster editing with synchronized multi-panel views, recode pixel tables, modification tracking
- Road Inspection ViewerNot QGIS 4 ready
Plugin displaying photos from road inspection.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.
