Home › Raster & terrain › TopoFast
TopoFast QGIS 4 compatibility
QGIS 4 ready Active
Yes — TopoFast supports QGIS 4 (declared max version 4.99.0).
Draw an area on the map and automatically get the DEM (OpenTopography) and its contour lines with a single click.
About
TopoFast automates the workflow: select an area -> download the matching DEM from the OpenTopography API -> extract contour lines with GDAL, loading both layers into the project. Requires a free OpenTopography API Key (https://opentopography.org/). Español: TopoFast automatiza el flujo: seleccionar un área -> descargar el DEM correspondiente desde la API de OpenTopography -> extraer las curvas de nivel con GDAL, cargando ambas capas en el proyecto. Requiere una API Key gratuita de https://opentopography.org/.
| Author | bpaucar |
|---|---|
| Downloads | 252 |
| Latest version | 0.36 (experimental) |
| Last updated | 2026-09-19 (27 days ago) |
| Min QGIS | 3.28.0 |
| Max QGIS | 4.99.0 |
| QGIS 4 ready | Yes |
| Maintenance | Active |
| Category | Raster & terrain |
| Tags | dem, curvas de nivel, contornos, opentopography, topografia, elevacion, gdal |
Homepage · Repository · Issue tracker · Official page
Alternatives in Raster & terrain
- Profile toolQGIS 4 ready
Plots terrain profile
- Qgis2threejsQGIS 4 ready
3D map visualization and web export powered by three.js JavaScript library
- SRTM-DownloaderQGIS 4 ready
Downloads SRTM Tiles from NASA Server
Related plugins
- ProfileMasterQGIS 4 ready
Longitudinal profiles, cross-sections, 3D axis, DTM buffer and contour lines from vector alignments or loaded QGIS layers over Digital Terra
- OrIFSCQGIS 4 ready
Generate cartographic base maps for the sport of orienteering
- OpenTopography DEM DownloaderQGIS 4 ready
This plugin downloads DEM from OpenTopography.org
- Global DEM PortalQGIS 4 ready
Select 1°x1° tiles on a map and download nine free global DEMs (SRTM, NASADEM, ALOS, Copernicus, Mapzen, ANADEM, GEDTM30) straight into QGIS
- OpenTopography Point ElevationQGIS 4 ready
Create a point layer with OpenTopography elevation values using a QGIS Processing algorithm.
- Open ICGCQGIS 4 ready
ICGC Open data access
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.