Home › Utilities › qgis-bridge
qgis-bridge QGIS 4 compatibility
Not QGIS 4 ready Active
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
Receives spatial layers from a Python environment and adds them to the current QGIS project.
About
Bridge between Python analysis environments and QGIS Desktop. Push GeoDataFrames and raster layers into QGIS with a single function call.
| Author | Raza Rizvi |
|---|---|
| Downloads | 254 |
| Latest version | 0.1.2 (experimental) |
| Last updated | 2026-04-11 (187 days ago) |
| Min QGIS | 3.28.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Active |
| Category | Utilities |
| Tags | jupyter, python, bridge, automation |
Homepage · Repository · Issue tracker · Official page
Alternatives in Utilities
- Plugin ReloaderQGIS 4 ready
Reloads a chosen plugin in one click
- Layers menu from projectQGIS 4 ready
Build layers shortcuts menus based on QGIS remote projects stored in PostgreSQL, local network or HTTP(S).
- Plugin Builder 3QGIS 4 ready
Creates a QGIS plugin template for use as a starting point in plugin development. This branch is in maintenance mode — for active developmen
Related plugins
- QNotebookNot QGIS 4 ready
Jupyter-style notebook for QGIS Python Console
- NotebookQGIS 4 ready
Render and run Jupyter notebooks within QGIS in a dockable panel.
- QGIS-FME Form ConnectorQGIS 4 ready
The QGIS-FME Form Connector plugin is a powerful tool that bridges QGIS and FME, enabling seamless data transformation and workflow automati
- QGIS-FME Form Connector AlgorithmQGIS 4 ready
The QGIS-FME Form Connector Algorithm plugin is a powerful tool that bridges QGIS and FME, enabling seamless data transformation and workflo
- Script ManagerQGIS 4 ready
A PyQGIS script manager for safe execution, debugging, and automation. Features a visual browser with an integrated output console, automati
- CadmusQGIS 4 ready
Advanced automation and geospatial productivity tools for QGIS projects.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.