Home › Vector tools › Split Lines By Points
Split Lines By Points QGIS 4 compatibility
QGIS 4 ready Active
Yes — Split Lines By Points supports QGIS 4 (declared max version 4.99.0).
Split Lines By Points
About
Breaks a line on points lying on or off it, with optional buffer and distance filters. GUI version with toolbar button.
| Author | Giulio Fattori |
|---|---|
| Downloads | 12,624 |
| Latest version | 1.7 |
| Last updated | 2026-03-14 (216 days ago) |
| Min QGIS | 4.0.0 |
| Max QGIS | 4.99.0 |
| QGIS 4 ready | Yes |
| Maintenance | Active |
| Category | Vector tools |
| Tags | python, vector, split, points, lines |
Homepage · Repository · Issue tracker · Official page
Alternatives in Vector tools
- HCMGISQGIS 4 ready
HCMGIS - Basemaps, Download OpenData, Batch Converter, VN-2000 Projections, and Field Calculation Utilities
- mmqgisQGIS 4 ready
A collection of QGIS vector layer operation plugins
- Shape ToolsQGIS 4 ready
Shape Tools is a collection of geodesic shapes and tools. Create circle, ellipse, line of bearing, points along a line of bearing, concentri
Related plugins
- ClosestPointNot QGIS 4 ready
Points Projector for QGIS count as for the SQL function ClosestPoint. Also cut lines by nearest points.
- Random Point on Lines...QGIS 4 ready
Random Points on Lines... is to generate random points on line layers, enhancing spatial data analysis by quickly simulating random data poi
- Right-click Actions ToolkitNot QGIS 4 ready
Universal right-click context menu plugin that automatically detects features (points, lines, polygons) anywhere on the canvas and provides
- Cluster GeneratorQGIS 4 ready
Creates cluster polygons from point, line, and polygon layers using an optional attribute field.
- KML ToolsQGIS 4 ready
Fast KML/KMZ importer, exporter, with description field expansion and ground overlay to GeoTIFF conversions.
- GPX_AppenderQGIS 4 ready
Append GPX waypoints or tracks directly into existing project layers. Drag & drop GPX files or folders, pick a destination layer, configure
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.