Home › Raster & terrain › GeomorphKit
GeomorphKit QGIS 4 compatibility
Not QGIS 4 ready Active
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
A high-performance, multiscale geomorphometry suite featuring memory-chunking and Numba-accelerated Geomorphon generation.
About
GeomorphKit calculates Slope, Aspect, Profile Curvature, Planform Curvature, Multiscale TPI, Multiscale TRI, and Geomorphons without crashing on massive DEMs.
| Author | Dr. Anass Marzouki |
|---|---|
| Downloads | 364 |
| Latest version | 1.0.0 |
| Last updated | 2026-07-23 (85 days ago) |
| Min QGIS | 3.14.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Active |
| Category | Raster & terrain |
| Tags | dem, multiscale, terrain, geomorphons, geomorphology, tri, tpi |
Homepage · Repository · Issue tracker · Official page
Alternatives in Raster & terrain
- Profile toolQGIS 4 ready
Plots terrain profile
- Qgis2threejsQGIS 4 ready
3D map visualization and web export powered by three.js JavaScript library
- SRTM-DownloaderQGIS 4 ready
Downloads SRTM Tiles from NASA Server
Related plugins
- Terrain Product StudioQGIS 4 ready
Publication-grade terrain maps from one DEM: 20 color palettes, USGS-style cartography, hydrology, geomorphometry, multi-hazard analysis, Ge
- Topo MapsNot QGIS 4 ready
微地形図の生成。Generate Topographic Maps.
- MAS Spatial Analysis ToolQGIS 4 ready
Comprehensive DEM analysis toolkit with 45+ hydrological, geomorphometric, and stream network tools. Numba-accelerated for fast processing.
- ArchaeoTerrainExplorerQGIS 4 ready
ArchaeoTerrain Explorer is an interactive micro‑topographic analysis tool designed for archaeological prospection. The plugin extracts a 256
- RichDEMNot QGIS 4 ready
Terrain analysis algorithms from the RichDEM library
- Terrain Analysis SymbologyNot QGIS 4 ready
Symbolize slope/aspect rasters with the Van Zuidam (1983) classification and compass-direction classes, plus an Aspect-Slope Bivariate Overl
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.